$400.00

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the distric on a case by case basis.


Water main extensions including - but limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

5/8"x 3/4"

Per bid

$250.00

Per bid

$87.50

*

6"

$25.00

$400.00

$1,000.00

4"

$35.00

1"

$5,000.00

6"

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

Per bid

System Development Charge

$9,063.00

*

4"

$10,000.00

$290.00

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

2"

Per bid

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

$6,000.00

$2,719.00

*

$906.00

$4,532.00

Tapping Charge

Per bid

Included

$1,450.00

$9,063.00

$1,400.00

Per bid

$4,000.00

Road Crossing Charge

$1,400.00

Monthly Service Charge is due each month regardless of whether water is used or not.

$25.00

Monthly Charge

*

Per bid

$1,200.00

*

Readiness  to Serve

Relocation Charge

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

Per bid

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

$145.00

$4,532.00

$1,200.00

Benefit Unit Charge

1.5"

Meter Size

Per bid

Road Crossing Charge

*

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the distric on a case by case basis.


Water main extensions including - but limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

Per bid

$4000.00

$8,000.00

Per bid

*

No Charge

Per bid

*

Per bid

Benefit Unit Charge

Relocation Charge

Per bid

$906.00

Tapping Charge

*

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

$290.00

Fire Line Meters

$1,000.00

Included

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

Monthly Service Charge is due each month regardless of whether water is used or not.

3"

$35.00

Residential & Commercial Meters

Per bid

*

Meter Size

$145.00

*

*

Per bid

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

System Development Charge

Per bid

Per bid

Per bid