Per bid

1.5"

Meter Size

$4000.00

$9,063.00

$87.50

*

$400.00

$1,000.00

4"

$290.00

Residential & Commercial Meters

Fire Line Meters

$906.00

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

*

$25.00

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

*

Per bid

Per bid

$1,000.00

*

$2,719.00

$10,000.00

Per bid

Readiness  to Serve

Included

$1,450.00

$9,063.00

Per bid

6"

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the distric on a case by case basis.


Water main extensions including - but limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

Per bid

Per bid

Per bid

$145.00

$1,200.00

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the distric on a case by case basis.


Water main extensions including - but limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

Road Crossing Charge

Per bid

Per bid

*

$1,400.00

5/8"x 3/4"

$6,000.00

Per bid

$906.00

$4,532.00

*

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

$8,000.00

*

6"

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

System Development Charge

Per bid

4"

Road Crossing Charge

Per bid

$290.00

$35.00

Per bid

$250.00

*

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

Tapping Charge

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

$1,400.00

$1,200.00

$4,000.00

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

Per bid

*

System Development Charge

$35.00

Per bid

Monthly Service Charge is due each month regardless of whether water is used or not.

Monthly Charge

Meter Size

Relocation Charge

Per bid

$25.00

*

3"

$400.00

Monthly Service Charge is due each month regardless of whether water is used or not.

Benefit Unit Charge

Per bid

1"

Benefit Unit Charge

Tapping Charge

*

No Charge

*

$4,532.00

2"

Per bid

Included

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

$5,000.00

Relocation Charge

$145.00