Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the district on a case by case basis.


Water main extensions including - but not limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

Per bid

Fire Line Meters

$906.00

Tapping Charge

Per bid

4"

Per bid

$10,000.00

$90.00

6"

$400.00

4"

Readiness  to Serve

Relocation Charge

Benefit Unit Charge

$1,000.00

Included

$9,063.00

$145.00

*

*

$28.00

$1,000.00

System Development Charge

$38.00

1"

Monthly Service Charge is due each month regardless of whether water is used or not.

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

Per bid

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

*

*

No Charge

Per bid

Per bid

1.5"

$28.00

Per bid

Per bid

$906.00

$4,532.00

2"

Tapping Charge

System Development Charge

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

Per bid

*

*

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

$400.00

$8,000.00

$2,719.00

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

Monthly Service Charge is due each month regardless of whether water is used or not.

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the district on a case by case basis.


Water main extensions including - but not limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

$9,063.00

$1,400.00

Meter Size

Per bid

*

$1,400.00

Per bid

Per bid

$250.00

$290.00

Residential & Commercial Meters

Per bid

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supply,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

$4000.00

Monthly Charge

Per bid

Included

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

6"

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

Meter Size

Per bid

*

$5,000.00

$293.00

3"

$38.00

5/8"x 3/4"

Road Crossing Charge

Benefit Unit Charge

Relocation Charge

*

$1,450.00

$6,000.00

*

Per bid

Road Crossing Charge

$148.00

Per bid

*

*

Per bid

$4,532.00

Per bid

$4,000.00

$1,200.00

$1,200.00