Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

Per bid

Per bid

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supply,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

Per bid

The System Development Charge (SDC) compensates Butler Water 5 for investments required in water supple,treatment,transmission and distribution facilities. The SDC is paid in addition to  the Benefit Unit Charge.

$250.00

Per bid

$145.00

*

*

$400.00

4"

Meter Size

Per bid

$400.00

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the district on a case by case basis.


Water main extensions including - but not limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

*

$1,400.00

*

Per bid

$10,000.00

6"

$1,000.00

Tapping Charge

Per bid

*

$1,400.00

5/8"x 3/4"

Per bid

$9,063.00

$2,719.00

4"

Per bid

$90.00

$28.00

*

No Charge

1.5"

Meter Size

$28.00

*

*

Any meter enlargement will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types.


Meter manufacturer meter type (turbine,compound,displacement,ect.) will be chosen by the district on a case by case basis.


Water main extensions including - but not limited to- materials, labor,engineering,surveying,and legal are paid for by the customer.

System Development Charge

Per bid

$6,000.00

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

Monthly Service Charge is due each month regardless of whether water is used or not.

$906.00

$38.00

Included

Per bid

Per bid

$5,000.00

Monthly Service Charge is due each month regardless of whether water is used or not.

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

$4000.00

Monthly Charge

Road Crossing Charge

$1,200.00

$4,000.00

$293.00

3"

Road Crossing is dependent on many factors including - but not limited to -length,type,terrain,and material.

$1,450.00

Benefit Unit Charge is for (one) meter only.Multiple meters will each incur the full range of applicable charges.

1"

Relocation Charge

Benefit Unit Charge

*

$1,000.00

$9,063.00

Road Crossing Charge

Per bid

Per bid

Fire Line Meters

Per bid

$8,000.00

$1,200.00

Benefit Unit Charge

Relocation Charge

6"

Per bid

Tapping Charge

Relocation larger than 1" will require a new tapping charge and a new road crossing charge,if applicable.

*

$4,532.00

Readiness  to Serve

System Development Charge

$38.00

$906.00

$148.00

2"

Included

Residential & Commercial Meters

Per bid

*

$290.00

Per bid

Per bid

$4,532.00

*